Header
Home | Sitemap Set as homepage | Add to favorites
  Search the Site     » Advanced Search
Sections



Final Verification

by

image

Final Verification

Regardless of which site survey method you choose, conduct a walkabout for verification after the system has been installed. For this task, use the same tools and guidelines for boundary values as the manual survey uses. Perform a walkabout of the perimeter, as well as any locations that might cause RF shadows, interference, or multipath areas. Test whether you can roam from one AP to another without dropping below the recommended cell boundary values, including packet retry counts. The use of a tool such as AirMagnet Surveyor helps to document this task for addition to the final


611 times read

Related news

» Surveying with the AirMagnet Tool
by admin posted on Jan 09,2007
» Assisted Site Surveys
by admin posted on Jan 09,2007
» Automatic and Assisted Site Survey Tools
by admin posted on Jan 09,2007
» Site Survey
by admin posted on Oct 19,2006
» Site Survey Report-Generation Programs
by admin posted on Jan 09,2007


More Top News
Cisco Wireless Networking
Most Popular
Featured Author